Micro #08
05 сентября 1998
  Железо  

Iron - turbirovanie 1818VG93

<b>Iron</b> - turbirovanie 1818VG93
         Turbirovanie 1818VG93.



                DD1 - 1533 (555) TM2


   WF / DE 1

     > O R 5

              2 Q

                 D



   WSTB 3

     > C

   ____ _ 6

   STEP 4 Q O

     > O S


                 X X

                July 1914

                          +5 B

                          >



               DD2 1533 (555) KP11


  2MHz 2

    > A0 4 CLK

                         Y0>

  1MHz 3

    > B0


             1

               AB



             15

               O E



                 X X

                August 1916

                            +5 B

                            >


   Signal WF / DE 33 VG93 conclusion (before this
not used).

   WSTB and CLK signals are at 30-m
24-m conclusions VG93 respectively. Old
signal from the 24-th output cut and used as a 1MHz. 2MHz 
signal we take with a 14-second pin. IE10 counter in the 
controller. 

        ____
 STEP signal is taken from the output to the drive.


          ---------------------

   That's the whole scheme. On my own I want to add
that she regularly works with all my friends on different types 
of controllers. 


    06.09.98 Computer Eye.

                    Special for "Micro 8.






Other articles:

Fido - ZX Spectrum and FidoNet in Zaporozhye

Poke's

Adapting programs to TR-DOS - Part 3

Iron - turbirovanie 1818VG93

about different - The rumor about Mortal Kombat 1024kb. Match of Virus II. On autopsy Mirrors.

From the Editor - On the future of newspapers

Humor


Темы: Игры, Программное обеспечение, Пресса, Аппаратное обеспечение, Сеть, Демосцена, Люди, Программирование

Similar articles:
about it - disassembly Kovrov spektrumistov.

В этот день...   21 November